{"id":1389,"date":"2019-04-19T14:44:51","date_gmt":"2019-04-19T12:44:51","guid":{"rendered":"https:\/\/www.portofrauma.com\/?p=1389"},"modified":"2020-05-22T11:40:29","modified_gmt":"2020-05-22T11:40:29","slug":"the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas","status":"publish","type":"post","link":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/","title":{"rendered":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s"},"content":{"rendered":"\n<p><br>Rauman Satama Oy will start work to implement stages 2 and 3 of Pet\u00e4j\u00e4skis. Rock is being mined and water areas are being filled in the port part of Pet\u00e4j\u00e4is. Work will begin in May and be completed in the fall of 2019. Upon completion of the investment, 9 hectares of new field space for storage use will be available.<\/p>\n\n\n\n<p><br>The new completed field areas will enable the full utilization of the berth capacity of the container terminal, which was commissioned in February this year. The extra space also allows for discussions about new projects and customer relationships. The cost estimate for the field investment to be implemented is approximately EUR 12.5 million, which, in addition to the actual construction contract, includes the treatment of contaminated soils and electrification, lighting, noise abatement and landscaping work in the area. &#8220;The investment, which is now starting, is a consistent extension of the recently completed dredging of the fairway and the expansion of the container terminal,&#8221; says Hannu Asumalahti, CEO of Rauman Satama Oy. &#8220;There has been a lot of interest in the new areas being completed and there is currently either a lease, a pre-agreement or a reservation for every square meter being completed.&#8221; The contract was signed with the Workers&#8217; Consortium Pet\u00e4j\u00e4n on Friday, April 27, 2018. The consortium includes Vilppulan Kivijaloste Oy, Maanrakennus Mikko Tiensuu Oy and Kaivinkoneurakointi L\u00f6nnqvist Oy. For more information: Hannu Asumalahti, President and CEO, Rauman Satama Oy +358 (0) 50 303 9700 Kari M\u00e4kip\u00e4\u00e4, President and CEO, Vilppulan Kivijaloste Oy +358 (0) 500 633 540<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rauman Satama Oy will start work to implement stages 2 and 3 of Pet\u00e4j\u00e4skis. Rock is being mined and water areas are being filled in the port part of Pet\u00e4j\u00e4is. Work will begin in May and be completed in the fall of 2019. Upon completion of the investment, 9 hectares of new field space for storage use will be available.<\/p>\n","protected":false},"author":1,"featured_media":1387,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-1389","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma\" \/>\n<meta property=\"og:description\" content=\"Rauman Satama Oy will start work to implement stages 2 and 3 of Pet\u00e4j\u00e4skis. Rock is being mined and water areas are being filled in the port part of Pet\u00e4j\u00e4is. Work will begin in May and be completed in the fall of 2019. Upon completion of the investment, 9 hectares of new field space for storage use will be available.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/\" \/>\n<meta property=\"og:site_name\" content=\"Portofrauma\" \/>\n<meta property=\"article:published_time\" content=\"2019-04-19T12:44:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-05-22T11:40:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"547\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Portofrauma\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Portofrauma\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/\"},\"author\":{\"name\":\"Portofrauma\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/#\\\/schema\\\/person\\\/e0cc5928959a7c0394b5439033675f90\"},\"headline\":\"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s\",\"datePublished\":\"2019-04-19T12:44:51+00:00\",\"dateModified\":\"2020-05-22T11:40:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/\"},\"wordCount\":269,\"image\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/portofrauma.com\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/por-korjattu-3.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/\",\"url\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/\",\"name\":\"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/portofrauma.com\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/por-korjattu-3.jpg\",\"datePublished\":\"2019-04-19T12:44:51+00:00\",\"dateModified\":\"2020-05-22T11:40:29+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/#\\\/schema\\\/person\\\/e0cc5928959a7c0394b5439033675f90\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/portofrauma.com\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/por-korjattu-3.jpg\",\"contentUrl\":\"https:\\\/\\\/portofrauma.com\\\/wp-content\\\/uploads\\\/2020\\\/05\\\/por-korjattu-3.jpg\",\"width\":1600,\"height\":547},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/\",\"name\":\"Portofrauma\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/#\\\/schema\\\/person\\\/e0cc5928959a7c0394b5439033675f90\",\"name\":\"Portofrauma\",\"url\":\"https:\\\/\\\/portofrauma.com\\\/en\\\/author\\\/portofrauma\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/","og_locale":"en_US","og_type":"article","og_title":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma","og_description":"Rauman Satama Oy will start work to implement stages 2 and 3 of Pet\u00e4j\u00e4skis. Rock is being mined and water areas are being filled in the port part of Pet\u00e4j\u00e4is. Work will begin in May and be completed in the fall of 2019. Upon completion of the investment, 9 hectares of new field space for storage use will be available.","og_url":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/","og_site_name":"Portofrauma","article_published_time":"2019-04-19T12:44:51+00:00","article_modified_time":"2020-05-22T11:40:29+00:00","og_image":[{"width":1600,"height":547,"url":"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg","type":"image\/jpeg"}],"author":"Portofrauma","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Portofrauma","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#article","isPartOf":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/"},"author":{"name":"Portofrauma","@id":"https:\/\/portofrauma.com\/en\/#\/schema\/person\/e0cc5928959a7c0394b5439033675f90"},"headline":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s","datePublished":"2019-04-19T12:44:51+00:00","dateModified":"2020-05-22T11:40:29+00:00","mainEntityOfPage":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/"},"wordCount":269,"image":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#primaryimage"},"thumbnailUrl":"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/","url":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/","name":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s - Portofrauma","isPartOf":{"@id":"https:\/\/portofrauma.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#primaryimage"},"image":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#primaryimage"},"thumbnailUrl":"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg","datePublished":"2019-04-19T12:44:51+00:00","dateModified":"2020-05-22T11:40:29+00:00","author":{"@id":"https:\/\/portofrauma.com\/en\/#\/schema\/person\/e0cc5928959a7c0394b5439033675f90"},"breadcrumb":{"@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#primaryimage","url":"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg","contentUrl":"https:\/\/portofrauma.com\/wp-content\/uploads\/2020\/05\/por-korjattu-3.jpg","width":1600,"height":547},{"@type":"BreadcrumbList","@id":"https:\/\/portofrauma.com\/en\/the-development-of-the-port-of-rauma-will-continue-with-the-launch-of-phases-2-and-3-of-petajas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/portofrauma.com\/en\/"},{"@type":"ListItem","position":2,"name":"The development of the Port of Rauma will continue with the launch of Phases 2 and 3 of Pet\u00e4j\u00e4s"}]},{"@type":"WebSite","@id":"https:\/\/portofrauma.com\/en\/#website","url":"https:\/\/portofrauma.com\/en\/","name":"Portofrauma","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/portofrauma.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/portofrauma.com\/en\/#\/schema\/person\/e0cc5928959a7c0394b5439033675f90","name":"Portofrauma","url":"https:\/\/portofrauma.com\/en\/author\/portofrauma\/"}]}},"_links":{"self":[{"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/posts\/1389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/comments?post=1389"}],"version-history":[{"count":0,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/posts\/1389\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/media\/1387"}],"wp:attachment":[{"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/media?parent=1389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/categories?post=1389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/portofrauma.com\/en\/wp-json\/wp\/v2\/tags?post=1389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}