Work begins. Getting ready the construction site at the container quay.

Dredging the base of the container quay expansion at Port of Rauma

Dredging with the massive dredger Hector (10 m3).

Tons of metal needed when building the base elements for the new container quay.

Making the base elements for the new container quay

Rock blasting at the northern part of the port has started. Several trucks are transporting the rock to the new container quay which will be filled with 500 000 tonnes of rock.

Keeping busy with the container terminal expansion work.

Container traffic continues as usual despite of the construction work of the expanded container quay & terminal.

These 15 meter bold constructions are made of concrete. They will create the base for the new container quay.

At the moment, 13 of the new container quay base elements are finished. The total amount will be 36.